Double click to open a project, and the tab displayed by default is the general tab.
Setup required before use |
Who can use it? | Where is it? |
---|---|---|
User (read only) Assistant Project Manager Project Manager Director Administrator System Administrator |
Projects > Open a Project > General Tab |
The Project General tab is used to store the site address, internal project manager, project status, and a description of the scope of work.
Store an overview of the Project that can be viewed by all Synergy users, and used to populate onto Synergy documents.
All fields stored on a project can be used as filters or added as columns on reports, can appear on document that are generated through Synergy and most can be searched on.
To change the project status (by Project Manager access level or higher):
View the Project status topic to learn more about how they are used.
Tip: Learn more about how to View the project site address on a map.
Show all Synergy users what type of project they are working on by setting a Project Image to be shown on the General tab. Any image in the project directory can be the project image shown in the bottom right corner of the General tab.
Select a project image by:
Remove the project image by:
Tip: Replace the existing project image by selecting a new project image file in the Documents tab.
To change the project directory (by Assistant Project Manager or higher):
Tips:
To change the project directory (by Director or higher):
View the Multi Office topic to learn more.
A project can only be deleted if it is at proposal status, and if no timesheets or expense entries exist. To delete a project:
Tip: The project directory on your server won't be deleted.
Looking for more help? Try reviewing the following Projects topics: View Topics