The
contract sum may be a single lump sum or it may be composed of several
breakdown items within the contract. The contract sum amount or
the breakdown items amount are all entered excluding tax. The
tax calculation is set at the Contract level.
The
original contract sum may only be configured while the Contract Status
is Draft. Once the Contract Status has been changed to In Progress,
the contract sum can only be changed by creating a Contract Sum Adjustment.
The Contract Sum can also be locked so that no Contract Sum Adjustments
can be entered.