Link the drawing register rows to an actual file in the Synergy Document Library. Linked files can be sent out on Transmittal Summary Documents.
Setup required before use |
Who can use it? | Where is it? |
---|---|---|
User Assistant Project Manager Project Manager Director Administrator System Administrator |
Projects > Documents > Drawing Register > Link Project Documents |
Tip: Before you can link the file to the drawing register row, the file must be saved in the Synergy Project Folder, or as a Controlled file within the Project Document Library.
The drawing register creation consists of three main steps:
This topic outlines how to complete Step 2. To link the drawing register rows to an document or drawing file located in the Project Document Library. The files can be stored within either the controlled or uncontrolled document libraries, and all files and file extension types are available to be linked to a drawing register row.
Choose which project documents can be sent out with the transmittal summary document.
In this function the drawing register rows are linked to the actual file in the Project Document Library. This step is required as the drawing register rows are often created before the actual file exists for the project.
The Link Documents window displays all the drawing register rows that have not yet linked to an actual project document. The linking process allows you to choose which file in the Project Controlled or Uncontrolled document library will be available to be sent out on a Transmittal Summary Document.
Tips:
Tip: If you are using Synergy Foundation, all files saved within the Project Folder will be shown as an Uncontrolled Documents. Upgrade to Synergy Enterprise to create Controlled files in the Document Management module.
Update the file that is linked to the drawing register row if the file has been moved to a different location in the Project Folder, or imported to be a Controlled Document.
Tips:
Use the Undo button in the toolbar to remove any unsaved changes. Unsaved changes will display the Save button on the right side of the row. Undo will refresh the list to show the last saved values for each of the rows.
Use the filter to change which drawing register rows are displayed, which is located in the top right hand corner of the window.
Export the data from the list in either MS Excel® format or using Synergy reports. Use the Synergy report option if you want to create a PDF file with the list data, or email the data to a Synergy staff member or contact.
Tip: Inactive drawing rows are not shown in this window. Reactive the row in the drawing register if you need to alter the linked project document.
Or try reviewing the following Document topics:View Topics
© 2019 Total Synergy Pty Ltd